House Raising Cost 2026: Raise, Build Under, and QLD Approvals
Summary
In the quotes we see across South East Queensland, lifting and restumping a typical 100 to 150 m² timber house costs $40,000 to $80,000. Building in underneath adds $2,000 to $3,500 per square metre of finished floor, which puts most raise-and-build-under projects between $250,000 and $500,000 all in. The lift itself takes one to three days. The approvals, engineering, and build-under take six to fourteen months. If your house sits in a character or flood overlay, the council decides how high you go and what you can use the ground floor for, so check that before you pay anyone to jack the house up.
Table of Contents
Most enquiries we get on house raising arrive with a number already attached. Someone has had a raising contractor out, been quoted $45,000 to lift the house and put it on new stumps, and wants to know what the drawings will cost to fill in the space underneath. It is a reasonable question. It also starts from the wrong number, because the lift is usually the cheapest part of the job.
The house lifting cost in Queensland sits at $40,000 to $80,000 for the raise and restump on a typical timber house. Turning the space underneath into habitable rooms is where the budget goes, at $2,000 to $3,500 per square metre finished. Between those two numbers sit a planning check, a soil test, a structural engineer, a building certifier, a QBCC (Queensland Building and Construction Commission) owner-builder permit, and in many Brisbane suburbs, a council overlay that limits how high you can lift and how the new ground floor can look. This article walks through each of those, in order, with the durations and costs we see on Queensland jobs.
What lifting a Queensland house costs in 2026
Raising contractors in South East Queensland are quoting $40,000 to $80,000 for a straightforward lift and restump on a 100 to 150 m² lowset or highset timber house. The spread comes from three things. Height is the first, because lifting a house 1.2 metres is a different job to lifting it 2.4 metres. Access is the second, since a sloping block or a tight side setback slows everything down. Post type is the third, as galvanised steel posts on engineered pad footings cost more than timber stumps but are what most certifiers will expect if you plan to build in underneath.
Building in is a separate line. A lower floor finished to lock-up sits at $1,600 to $2,200 per square metre. Finished with a bathroom, laundry, and kitchenette, expect $2,000 to $3,500. On 90 m² of new lower floor, that is $180,000 to $315,000 before the lift is added back in.
If you are weighing this against going up instead, our guide to second storey extension cost covers the other path.
The timeline from first quote to finished lower floor
The lift is one to three days of work on site. The project around it is six to fourteen months. Most owner-builders we speak to plan for the first figure and get the second.
| Stage | Typical duration | Commonly underestimated |
|---|---|---|
| Site survey, soil test, planning check | 2–4 weeks | Sometimes |
| Concept and working drawings | 4–8 weeks | Rarely |
| Structural engineering | 2–4 weeks | Sometimes |
| Council development application (if an overlay triggers one) | 8–16 weeks | Almost always |
| Building approval through a private certifier | 2–4 weeks | Sometimes |
| QBCC owner-builder permit | 2–4 weeks | Often, because the course comes first |
| Lift, restump, and services reconnection | 3–6 weeks | Often |
| Build in underneath | 4–9 months | Almost always |
Two rows do most of the damage. The council application only applies to some properties, but when it applies it can double the pre-construction timeline. The build-under is where owner-builders juggling trades in their spare time lose months, because every trade below the house is waiting on the trade before it.
Each stage, and what it costs you
The order matters more than any single price. Getting a stage out of sequence is how a $60,000 lift becomes a house sitting on cribbing for eight weeks while someone redraws the stairs.
Planning check and site investigation
Before any drawings, find out what your council allows. In Brisbane, the low density residential zone generally caps a dwelling at 9.5 metres and two storeys. If your house sits in the traditional building character overlay, raising it is likely to need code assessment, and the code cares about how far you lift and whether the ground floor reads as a solid lower storey. We could be wrong on the detail for your particular street, so treat this as a reason to check, not a rule. A contour and detail survey runs $1,500 to $3,000. A soil test runs $600 to $1,200, and the engineer needs it before designing footings.
Drawings, engineering, and flood levels
This is where the height gets decided. The NCC (National Construction Code) requires 2.4 metres floor to ceiling in habitable rooms of a house, with 2.1 metres allowed in kitchens, bathrooms, and corridors. Add the floor structure above and you usually need 2.7 to 3.0 metres clear under the bearers. If you are in a flood overlay, the habitable floor level has to sit above the defined flood level plus a freeboard, commonly 500 millimetres in Brisbane, and some lower floors end up limited to garage and storage. Structural engineering for posts, footings, bracing, and tie-downs runs $2,500 to $6,000.
Approvals and the owner-builder permit
There are two separate approvals here, and people often treat them as one. If an overlay triggers a development application, council assesses the planning side. A private building certifier then issues building approval against the NCC and the Queensland Development Code, at $3,000 to $6,000. If you are unsure which is which, our piece on the difference between building and planning permits separates them. On top of that, owner-builder work valued over $11,000 in Queensland needs a QBCC owner-builder permit, which means completing an approved course first. Queensland generally allows one owner-builder permit every six years, so this project uses your turn. Our guide to owner-builder permits covers the application.
The lift and restump
The raising contractor must hold the right QBCC licence for the work, even though you are the owner-builder managing the job. Before the house moves, a licensed electrician and plumber disconnect services, at $5,000 to $15,000 to disconnect, extend, and reconnect. New front and rear stairs are rarely in the raising quote and run $8,000 to $25,000 depending on materials and height.
Building in underneath
Once the house sits on its new posts, the job becomes a ground-floor build with a house overhead. Slab, termite management, framing, cladding, windows, waterproofing, and internal stairs all happen in a space that the trades cannot reach from above.
Where the quotes stop and the costs keep going
Raising contractors in Queensland compete hard on the headline price, and the headline price is the jack-up and the posts. That is the job they do, so it is not dishonest. It does leave the owner-builder holding everything around it. A raising quote that excludes stairs, services, and demolition is like the price on a cake mix at Woolworths. The eggs, the butter, and the oven are your problem.
The lines we see missing most often are predictable. Stairs come first, because the old ones no longer reach the ground. Services follow, because a plumber has to extend every pipe that used to be 1.5 metres long and now needs to be 3 metres. Removing existing ground-level slabs, old laundry tubs, and lattice is often excluded, as is the concrete slab for the new lower floor. Retaining walls appear when lifting a house on a slope exposes a cut that was never engineered. Fixing the cracked plaster and sticking doors upstairs that a lift can produce is usually on you, at $2,000 to $10,000 depending on how old the house is and how much it moves.
Then there is the timing cost. If the planning question is not answered before the lift, you can end up with a house raised to a height council will not approve for habitable rooms, and a choice between lowering it or accepting a ground floor you can only use for parking. Both are expensive. One is permanent.
What Draftee does
We prepare the drawings that council, the certifier, and your engineer work from: the existing house measured up, the new floor level set against overlay and flood requirements, and the lower floor laid out so it passes the ceiling height rules on the first submission. We draw the plans, we don’t sell buildings, so we have no stake in which raising contractor or which builder you choose. Our job is that the drawings are right before the house leaves the ground.
Keeping the job tight as an owner-builder
Most of the delay on a Queensland raise happens before anything is lifted, and most of the overspend happens after. Both are controllable if you take the stages in order and refuse to let a contractor’s availability set the sequence.
Get the planning answer first. A survey, a soil test, and a check of your council’s overlay mapping cost under $5,000 combined and tell you whether the height you want is achievable. Fix the floor-to-floor height in the drawings before the raising contractor sets posts, because moving a post is cheap on paper and expensive in concrete. Ask every raising contractor to price stairs, services, and demolition as separate lines, even if they say those are excluded, so you can see the gap and fill it with a real number.
Book the trades for the build-under in sequence, and expect them to slip. A plumber who cannot rough in because the slab is late becomes a plumber who is now on another job for three weeks. Budget a contingency of 10 to 15 percent on the build-under. If you sell within six years, Queensland requires a notice telling the buyer the work was owner-built, and owner-builders sit outside the statutory home warranty scheme, so insure accordingly while the house is in the air.
None of this is complicated. It just has to happen in the right order. Skip the order and the house sits on cribbing while you sort it out.
Ready to draw?
If you are planning to raise and build under in Queensland, the drawings and the floor height are the first decisions that cost real money to change later. We work with owner-builders across NSW, VIC, QLD, WA, and TAS, and we will tell you plainly what your site can and cannot support. Tell us about your block and we will come back to you with scope and next steps.
Continue Your Research

House Lifting Cost 2026: Raise, Build Under, and QLD Approvals

Cost to Build a Townhouse 2026: Real Numbers for Owner-Builders

Garage Conversion Melbourne 2026: Real Costs, Permits, and Timelines
Draftee provides architectural drafting services. This article is general information only and is not legal, engineering, planning, financial, or construction advice. Costs are indicative ranges drawn from quotes we have seen in South East Queensland for 2025 and 2026 and will vary with your site, house condition, council, and contractor. Regulatory details, including planning overlays, flood levels, height limits, QBCC owner-builder permit thresholds, and the NCC 2025 transitional provisions, change over time and differ between Queensland councils and between properties within the same council. Verify them locally with your council, a registered building certifier, a structural engineer, and the QBCC before committing to any work.
Last updated and changelog
Last updated: 3 November 2026
Changelog:
– 3 November 2026: Initial publication